×

Russia’s Putin renames planned ‘Power of Siberia 2’ pipeline to ‘Power of Baikal’ pipeline, minister says

By Thomson Reuters Sep 2, 2026 | 2:27 AM

VLADIVOSTOK, Russia, Sept 2 (Reuters) – Russian President Vladimir Putin has renamed the planned “Power of Siberia 2” gas pipeline ​to China to the “Power of ‌Baikal” pipeline, Russia’s Energy Minister Sergei Tsivilev said on Wednesday.

He did not say if any other elements of the project had been changed.

“We are ‌in ​the final stages of ⁠moving to the construction ⁠of the project formerly known as Power of Siberia 2, but thanks to Vladimir Vladimirovich (Putin), he named it, quite literally, ​Power of Baikal,” Tsivilev told the Eastern Economic Forum in Russia’s Pacific ⁠port of Vladivostok.

The planned ⁠2,600-km (1,616-mile) pipeline is expected to ​carry 50 billion cubic metres (bcm) of gas per ​year to China through Mongolia from ‌the Arctic gas fields of Yamal. It would complement the existing Power of Siberia 1 pipeline that brought 38 bcm ⁠of gas from Russia to China last year.

The planned pipeline  has long been stalled due ⁠to disagreements ‌over the price of the ⁠gas it will carry. Putin ​has ‌said that the price of ​gas would ⁠be based on a market formula similar to the one Russia uses to calculate the cost of shipments to Europe.

(Reporting by Vladimir Soldatkin and Olesya AstakhovaEditing by ​Andrew Osborn)