Dec 17 (Reuters) – A U.S. judge on Wednesday blocked Michigan state from enforcing a 2020 order to shut down Enbridge’s Line 5 pipeline running beneath a channel linking two of the Great Lakes, a court filing showed.
(Reporting by Ryan Patrick Jones and Bhargav Acharya in Toronto; Editing by Caroline Stauffer )

